ETAC POWER

AI Data Centre EPC Services

ETAC provides integrated AI Data Centre Engineering, Procurement, and Construction (EPC) services, delivering engineering, procurement, and construction solutions for mission-critical data centre power infrastructure across North America. Our projects support high-density AI and hyperscale computing facilities requiring 20MW+ of reliable, utility-connected electrical capacity.

Through a coordinated EPC delivery model, ETAC POWER manages the full lifecycle of data centre power systems—from electrical system architecture and transformer platforms to installation, testing, and final commissioning. Our approach ensures reliable power infrastructure, efficient project execution, and clear accountability throughout the entire development process.

20MW+ Deployments Utility Interconnection N+1 / 2N Ready North America
Data centre power systems and electrical infrastructure

Power Infrastructure & EPC Delivery

ETAC Power delivers large-scale power infrastructure for AI data centres across North America. We support high-density facilities requiring 20MW+ of reliable, utility-interconnected capacity.

Our scope covers engineering, equipment supply, site construction, and commissioning. By coordinating system design, transformer manufacturing, generator supply, and field execution under one structure, we reduce handoffs and maintain schedule control.

We focus on practical delivery—providing stable power, clear timelines, and accountability from design through energization.

Single-Point Accountability
One delivery team managing engineering, procurement, construction, and commissioning.
Utility Alignment
Interconnection-ready designs aligned to utility requirements and schedules.
Phased Scalability
Expand capacity in blocks while maintaining redundancy and uptime targets.

Complete Power Systems for AI Deployments

We provide integrated power packages designed for hyperscale and AI-focused facilities. Systems are engineered for high fault levels, continuous 24/7 operation, and future load expansion.

Typical scope includes
  • Utility-interconnected high-voltage substations
  • Medium-voltage transformer platforms
  • Switchgear, protection, and control systems
  • Paralleled generator systems for backup and load support
  • N+1 and 2N redundancy configurations
  • Utility coordination, testing, and commissioning
HV Substations MV Distribution Backup Generation Protection & Control
High voltage and medium voltage electrical equipment for AI data centre EPC
EPC delivery model for AI data centre power infrastructure

20MW+ Scalable Delivery Model

AI data centre projects demand speed without sacrificing reliability. ETAC Power supports deployments of 20MW and above using a structured EPC framework aligned with utility schedules and long-lead equipment planning.

How we help developers
  • Reduce procurement risk and supply chain uncertainty
  • Maintain grid compliance and utility coordination
  • Protect commissioning timelines with early sequencing
  • Scale capacity in phases while maintaining redundancy

Our objective is straightforward: deliver dependable power infrastructure that allows AI facilities to come online as planned.

Our Partners

We collaborate with established global and regional manufacturers across transformers, switchgear, controls, and power systems. Replace these placeholders with your actual partner logos.

20MW+ AI Data Centre EPC Lifecycle

A structured, end-to-end EPC delivery process to reduce handoffs, protect schedule control, and ensure commissioning readiness.

1
Project
Alignment
2
Engineering
& Design
3
Equipment
Manufacturing
4
Logistics
& Delivery
5
Install
& Construction
6
Testing
& Commissioning

Frequently Asked Questions

What does EPC cover for AI data centres?

EPC can include system engineering, equipment procurement, construction, testing, and commissioning—coordinated under one delivery structure.

Do you support utility interconnection?

Yes. We align engineering deliverables with utility requirements, coordinate sequencing, and support testing and commissioning readiness.

What scale do you support?

We support high-density deployments requiring 20MW+ capacity, including phased expansion designs and redundancy-ready architectures.

Request Project Consultation

Planning an AI data centre or high-density compute facility? Contact ETAC Power to discuss scalable EPC delivery and power infrastructure solutions.